📋 CAMO Admin – Input Overview Table

Input Description Source Timeframe Importance
Airworthiness Directive (AD) Mandatory fix for unsafe conditions. EASA / State of Design High – strict deadlines
Service Bulletin (SB) OEM recommended improvements. Optional unless mandated. Manufacturer / OEM Medium – aligned with scheduled checks
Maintenance Program (AMP) Scheduled repetitive tasks per aircraft type. Type Certificate Holder / CAMO Continuous – based on FH, FC, or calendar
Defect Log / Tech Log Reports from crew or maintenance on discrepancies. Pilots / Mechanics High – MEL/CDL timelines apply
MEL / CDL Items Deferred items allowed under MEL/CDL limits. MEL Manual / EASA High – categorized timelines
Component Tracking Log changes: part #, install/removal, SNs. Tech Crew / System Input Medium – update after action
LLP Tracking Critical parts with flight-hour or cycle limits. OEM / Tracking System High – mandatory tracking
CRS (Release to Service) Signed statement confirming maintenance completion. Licensed Engineers Immediate – post task
ARC Docs Documents needed for annual airworthiness review. CAMO / Review Staff Annually
New Aircraft Delivery Setup System integration of new aircraft (AD/SB/AMP filtered). OEM / Delivery Team Once – before entry into service

Navigate Docs